Written by Paul Kohlmann.
Building the M.20 fuselage
Free plans and abridged tutorial
Read the full tutorial in the August 2015 issue of Model Aviation.
Download Free Plans
Document
Document
Image
Image
A Miles M.20 emerges from the woodwork.
Image
This inexpensive tool makes light work out of stripping balsa.
Image
Balsa infill between the stringers forms the canopy opening while a vacuum formed canopy is fitted over the top.
Image
Servos in place and rigged for control rod on the elevator and pull-pull on rudder and tail wheel.
Image
EZ Connectors and Z-bend/pliers make control rod installation a breeze.
Image
Control rod exiting through infill panel and connected with a Z-bend to a control horn.
Image
After centering the motor behind the nose former, one screw holds the motor in place while the others are drilled with the mount in place.
Follow the entire build! (Build the Miles M.20)
Installment #1
(Toolbox basics)
Installment #5
(Building the tail group)
Installment #9
Casting detail parts
Installment #2
(Balsa builders' parlance
Installment #6
(Building the fuselage)
Installment #10
(Waterslide decals)
Installment #3
Reading plans
Installment #7
Building the wing
Installment #11
(Wrapping it up)
Installment #4
Workflow planning
Installment #8
Polyspan and paint
Download all installments
(.zip format - 46MB)
Comments
BF109
CAN YOU TELL ME THE ORIENTATION OF WP (WING PIN PLATE)NOT SURE IF SLOT IS OUT OR IN
Add new comment